South Sudan: Juba Response Update: South Sudan | CCCM | Update #12 (25 July 2016)

$
0
0
Source: Agency for Technical Cooperation and Development, International Organization for Migration, CCCM Cluster
Country: South Sudan

In coordination with the Inter-Cluster Working Group, the Camp Coordination and Camp Management (CCCM) Cluster continues to advocate for non-creation of new camp-like settings in Juba. Humanitarian interventions should be aimed at providing temporary emergency assistance that will not serve as a pull factor for IDPs to remain in the sites. OCHA reports that 14,084 people remain displaced by the insecurity in Juba. Of these, 10,838 people are sheltering in the UN Tong Ping and UN House bases. An estimated 3,246 IDPs are staying in Don Bosco collective center in Gumbo.

UNMISS TONGPING

CCCM

Camp Management

• Estimated population figure remains at 4,000.
• Camp management continues to support the movement of IDPs from one location in the site to another to facilitate construction of communal shelters.

Relocation

• The dry run of the relocation route involving all participants of the relocation convoy participants (IOM busses with UNMISS and SPLA escort) will take place today 26 July.
• The relocation is expected to begin on Wednesday 27 July, the planned relocation is contingent on feedback from UN House on preparedness for reception of IDPs.
• 210 IDPs have voluntarily registered for relocation, indicating that they have family or plots at UN House. This group will be prioritized for relocation.
• It is planned for two rotations of relocation convoy to take place, at 0800 hours and 1300 hours.

WASH

• IOM delivered 54,000 liters of safe drinking water at a rate of 13.5L per person per day.
• Four water points and 30 taps with one tap for 133 people.
• 76 latrines are functional, with 52 person per latrine. 14 hand washing facilities are installed and functional.
• The total sludge de-sludged from the UNMISS latrines is 12 cubic meters.
• 6 cubic meters of de-sludged from UNMISS latrines by UNMISS truck.
• Construction of 10 bathing shelters is ongoing.
• 57 health hygiene promoters (HHP) are on the ground working, with one HHP for every 70 people.
• 50 latrine cleaners (20) and garbage collectors (20) are on the ground and working.
• 30 garbage collection bins have been prepositioned at different sites in the camp.

Health

• IOM conducted 183 health consultations at its temporary clinic
• 3 new cases of cholera were reported and immediately referred to the Cholera Treatment Centre (CTC) (Juba Teaching Hospital).
• There will be a phased approach to the Oral Cholera Vaccination (OCV) campaign (1) OCV on exit for IDPs relocating to UN House and (2) Mass campaign in the Tong Ping site on 27th and 28th July.
• 172 households (1,402 individuals) were reached with health hygiene promotion messaging.

S&NFI

• Four new shelters have been completed.
• 17 (15 full size shelters for 50 individuals and 2 half size for 25 individuals) completed shelters on site, with the capacity to house 800 individuals.
• Site development continues with marram spreading and compacting.
• Tents for transit site have been procured and will be installed today 26 July.


Viewing all articles